Skip to content
Licensed · Bonded · Insured — License #CB-204871
BEDROCKRequest a Quote
Civil

Harbor Bridge Approach

LocationBellingham, WA
SizeHeavy civil · 1.4 miles
Completed2021

Project overview

A 1.4-mile approach roadway with two cast-in-place box-girder bridges, retaining walls totaling 18,000 sq ft, deep-drainage utility installation, and full roadway paving. The project was delivered in a single construction season to minimise disruption to port operations.

“Every detail was tracked, every timeline was met. The Bedrock team communicated proactively and treated our budget like it was their own.”
OW
Project Owner
Bellingham, WA

Scope of work

  • Two CIP box-girder bridges
  • 18,000 sq ft MSE retaining walls
  • Deep-drainage utility package
  • 1.4 miles roadway paving
  • Port operations coordination
  • Single-season delivery
← All projects